The National Programme of Waste Prevention of 2014-2020 fixed wastes from building and public works as priority No.1, with a set of 4 measures.

  • Action 1: establishment of specific awareness actions, destined for the project owners.
  • Action 2: a voluntary commitment charter for the business sectors to encourage the prevention of[…]
 Plus de détails

Déclinaisons
  • Format électronique

Fiche technique

Auteurs COPPENS M, JAYR E, BURRE-ESPAGNOU M, NEVEUX G, RDC ENVIRONMENT, éco BTP, I CARE ENVIRONNEMENT
Public(s) Entreprises et fédérations professionnelles
Collectivités territoriales
Thématique Economie circulaire et Déchets
Collection Expertise
Date d'édition 2016/04
Nb. de pages 12 P
Format pdf/A4
Langue EN
Périmètre de publication International

En savoir plus

The National Programme of Waste Prevention of 2014-2020 fixed wastes from building and public works as priority No.1, with a set of 4 measures.

  • Action 1: establishment of specific awareness actions, destined for the project owners.
  • Action 2: a voluntary commitment charter for the business sectors to encourage the prevention of waste.
  • Action 3: identification and use of action levers to develop the reclamation of materials in the building and public works sector.
  • Action 4: a review of the regulations on demolition diagnostics, and proposal of changes where appropriate.
It is within the framework of Action 3 that this study takes place, on the basis of the finding of the existence of constraints in terms of the responsibility of the producers and users of reclaimed products and materials, and of guarantees as to the quality and insurance conditions inherent in the reclamation of construction products and materials. The report presents the main findings as far as constraints and levers of reuse are concerned and distinguishes 2 sectors : building and public works. It also provides 16 feedback sheets, based on real reuse cases. Recommendations are given through an action plan in order to define a specific framework of reuse (in terms of requalification of products and of control of risks), required to a greater level of confidence of stakeholders and actors (project owners and contractors, insurance companies, controllers) and allowing enable the progressive and secure development of reuse.