Agrandir l'image
Scientific report: DIKWE phase 1
Tank test and numerical simulation results
Neuf
The Dikwe project aims at designing and installing a modular seawall to harvest wave energy. This project was born out of the meeting between the company Geps Innov, the Legendre Group and Ifremer. It is divided into three phases:
- Numerical studies and basin tests;
- Test at sea of a prototype on the[…]
Fiche technique
Auteurs | IFREMER |
Co-auteur(s) | Geps Techno, Geps Innov |
Public(s) | Secteur de la recherche |
Thématique | Recherche et Innovation |
Changement climatique | |
Energies | |
Collection | Expertise |
Date d'édition | 2021/02 |
Nb. de pages | 11 P |
Format | pdf/A4 |
Langue | EN |
Périmètre de publication | National |
International |
En savoir plus
The Dikwe project aims at designing and installing a modular seawall to harvest wave energy. This project was born out of the meeting between the company Geps Innov, the Legendre Group and Ifremer. It is divided into three phases:
- Numerical studies and basin tests;
- Test at sea of a prototype on the scale ¼;
- Design, installation and demonstration of a scale 1 demonstrator.
This report present the main results of the phase 1 of the project.