Scientific report: DIKWE phase 1 Agrandir l'image

Scientific report: DIKWE phase 1

Tank test and numerical simulation results

Neuf

The Dikwe project aims at designing and installing a modular seawall to harvest wave energy. This project was born out of the meeting between the company Geps Innov, the Legendre Group and Ifremer. It is divided into three phases:

  • Numerical studies and basin tests;
  • Test at sea of a prototype on the[…]
 Plus de détails

Déclinaisons
  • Format électronique

Fiche technique

Auteurs IFREMER
Co-auteur(s) Geps Techno, Geps Innov
Public(s) Secteur de la recherche
Thématique Recherche et Innovation
Changement climatique
Energies
Collection Expertise
Date d'édition 2021/02
Nb. de pages 11 P
Format pdf/A4
Langue EN
Périmètre de publication National
International

En savoir plus

The Dikwe project aims at designing and installing a modular seawall to harvest wave energy. This project was born out of the meeting between the company Geps Innov, the Legendre Group and Ifremer. It is divided into three phases:

  • Numerical studies and basin tests;
  • Test at sea of a prototype on the scale ¼;
  • Design, installation and demonstration of a scale 1 demonstrator.

This report present the main results of the phase 1 of the project.

Documents liés (1)